Welcome to India Renewable Energy News | Contact: +91 9220337640

All News About Policy & Regulations

Challenges in Renewable Energy Procurement and Lessons for 500 GW Goal

Challenges in Renewable Energy Procurement and Lessons for 500 GW Goal

India's journey towards achieving 500 GW of non-fossil fuel capacity by 2030 faces hurdles in renewable…

4th Amendment to GNA Regulations: Transforming Renewable Energy Connectivity

4th Amendment to GNA Regulations: Transforming Renewable Energy Connectivity

The Fourth Amendment to the General Network Access (GNA) Regulations introduces key changes that…

First Solar’s Thin Film PV Modules: Powering PM-KUSUM’s Solar Revolution

First Solar’s Thin Film PV Modules: Powering PM-KUSUM’s Solar Revolution

First Solar's thin-film PV modules are designed to meet the unique requirements of India's PM-KUSUM…

MNRE’s Benchmark Solar Prices Fall Short of Market Reality

MNRE’s Benchmark Solar Prices Fall Short of Market Reality

The MNRE’s benchmark pricing for residential rooftop solar—Rs50,000/kW for the first 2 kW and Rs45,000/kW…

Haryana Electricity Regulatory Commission (HERC) Amends Green Energy Open Access Rules, Expands Eligibility

Haryana Electricity Regulatory Commission (HERC) Amends Green Energy Open Access Rules, Expands Eligibility

The Haryana Electricity Regulatory Commission (HERC) has introduced key amendments to its Green…

MoEFCC Amends Battery Waste Management Rules, 2025 to Strengthen EPR Compliance

MoEFCC Amends Battery Waste Management Rules, 2025 to Strengthen EPR Compliance

The Ministry of Environment, Forest, and Climate Change (MoEFCC) has introduced amendments to the…

Madhya Pradesh Unveils Renewable Energy Policy 2025 with 50% RE Target by 2030

Madhya Pradesh Unveils Renewable Energy Policy 2025 with 50% RE Target by 2030

The Madhya Pradesh government has introduced the Renewable Energy Policy 2025, aiming to derive 50%…

India’s Smart Meter Program Faces Significant Delays, with Only 2.085 crore Installed

India’s Smart Meter Program Faces Significant Delays, with Only 2.085 crore Installed

India’s ambitious plan to install 25 crore smart meters by March 31, 2026, under the Revamped Distribution…

APTEL Rules Wheeling Charges Should Be Levied Only on Actual Consumption

APTEL Rules Wheeling Charges Should Be Levied Only on Actual Consumption

In a significant ruling, the Appellate Tribunal for Electricity (APTEL) has determined that wheeling…

TNERC Rejects TNGECL’s Petition on Solar Procurement Under PM-KUSUM

TNERC Rejects TNGECL’s Petition on Solar Procurement Under PM-KUSUM

The Tamil Nadu Electricity Regulatory Commission (TNERC) has dismissed a petition by Tamil Nadu Green…