Welcome to India Renewable Energy News | Contact: +91 9220337640



Follow India Renewable Energy News on WhatsApp for exclusive updates on clean energy news and insights

Pace Digitek Subsidiary Wins INR 997 Million Order from Advait Greenergy for LFP-Based BESS Supply

Dec 05, 2025

Lineage Power, a subsidiary of Pace Digitek, has secured an order worth Rs 997.1 million from Advait Greenergy for the supply of LFP-based Battery Energy Storage Systems (BESS).

The company noted that the project includes delivering advanced LFP BESS units along with associated equipment, highlighting Lineage Power’s capability to provide dependable and energy-efficient solutions for India’s fast-growing clean energy infrastructure.

According to the regulatory filing, 50% of the BESS DC block supplies must be delivered by March 15, 2026, while the remaining components of the full system are scheduled for supply by April 15, 2026.

Pace Digitek stated that this partnership strengthens the group’s position in integrated power management across telecom and renewable sectors, especially as India accelerates its focus on sustainable energy and grid stability.

Just last month, Lineage Power received an Rs 199.42 crore order from L&T Construction to deliver 275.83 MWh of liquid-cooled LiFePO? BESS containers for the Bihar State Power Generation Company’s Kajra project.

Earlier, in October 2025, Pace Digitek won an Rs 1,159.31 crore contract from the Solar Energy Corporation of India (SECI) to supply a 600 MW/1,200 MWh BESS, along with 10 years of service and maintenance support.

In June 2025, Union Minister for New and Renewable Energy Pralhad Joshi inaugurated the company’s 5 GWh BESS manufacturing facility at the Bidadi Industrial Area in Bengaluru. The facility features a fully automated cell-to-pack assembly line, enabling precision-driven, high-quality production with minimal human intervention.