Welcome to India Renewable Energy News | Contact: +91 9220337640

All News

RECPDCL Issues Tender for Transmission Infrastructure to Evacuate 2.8 GW of Renewable Power in Rajasthan

RECPDCL Issues Tender for Transmission Infrastructure to Evacuate 2.8 GW of Renewable Power in Rajasthan

REC Power Development and Consultancy Limited (RECPDCL) has invited bids for the development of an…

APM Projects Secures DMRC Contract for 5 MW Rooftop Solar Installations

APM Projects Secures DMRC Contract for 5 MW Rooftop Solar Installations

APM Projects has emerged as the successful bidder in Delhi Metro Rail Corporation’s (DMRC) auction…

Northern Railway Issues Tender for 1 MW Grid-Connected Solar Project in Ambala Division

Northern Railway Issues Tender for 1 MW Grid-Connected Solar Project in Ambala Division

The Northern Railway, Ambala Division, has invited bids for the installation of a 1 MW (1,000 kW)…

Chennai Petroleum Seeks Consultants for Pre-Feasibility Study of 100 MW Wind-Solar RTC Projects

Chennai Petroleum Seeks Consultants for Pre-Feasibility Study of 100 MW Wind-Solar RTC Projects

Chennai Petroleum Corporation Limited (CPCL), a subsidiary of Indian Oil Corporation, has invited…

ISGF and NISE Sign MoU to Strengthen Cooperation on Solar Integration and Grid Modernisation

ISGF and NISE Sign MoU to Strengthen Cooperation on Solar Integration and Grid Modernisation

The India Smart Grid Forum (ISGF) and the National Institute of Solar Energy (NISE) have entered…

SECI and NDMC Enter MoU to Install Solar Systems on 244 Municipal Buildings in Delhi

SECI and NDMC Enter MoU to Install Solar Systems on 244 Municipal Buildings in Delhi

The Solar Energy Corporation of India (SECI) has signed a Memorandum of Understanding (MoU) with…

Juniper Green Energy Brings Online Additional 72 MWp Solar Capacity of Hybrid Project in Maharashtra

Juniper Green Energy Brings Online Additional 72 MWp Solar Capacity of Hybrid Project in Maharashtra

Juniper Green Energy has commissioned an additional approximately 72 MWp of solar capacity as part…

DERC Plans Gradual Phase-Out of Additional Surcharge for Open Access Consumers

DERC Plans Gradual Phase-Out of Additional Surcharge for Open Access Consumers

The Delhi Electricity Regulatory Commission (DERC) has proposed a phased withdrawal of the additional…

NTPC Green Energy Commissions First 300 MW of 500 MW Bhadla Solar Project in Rajasthan

NTPC Green Energy Commissions First 300 MW of 500 MW Bhadla Solar Project in Rajasthan

NTPC Green Energy has successfully commissioned 300 MW of its 500 MW Bhadla solar photovoltaic project…

Pace Digitek Wins Rs 375.72 Crore Solar EPC Contract from Bondada Engineering for 300 MW Project

Pace Digitek Wins Rs 375.72 Crore Solar EPC Contract from Bondada Engineering for 300 MW Project

Pace Digitek has secured a solar EPC contract valued at Rs 375.72 crore from Bondada Engineering…